Dangerous When Wet - dangerous when wet
RoadsignsVictoria meaning
Councils are authorised under Section 122 of the Road Transport Act 2013 to install any prescribed traffic control device that is not in the Traffic Signs register, in particular delineation markings, if the installation of such a device is necessary to carry out a function under a delegation to Councils by Transport for NSW
RoadsignsWestern Australia
Road work ahead signs are placed to warn drivers of upcoming construction work. They are necessary to ensure the safety of both drivers and workers while construction is underway.
Don't know what kind of sign you have? Email us pictures of the stand and we will help you pick the correct corner pockets and sign adapters (if needed) ----> sales@trans-supply.com.
QLD roadsignsand meanings
All road work ahead signs come with cross bracing for support. Work ahead signs are made up of Mesh for daytime use, Non Reflective Vinyl also for daytime use, and Standard Reflective for day and night time use.
This sign register covers the standard signs used in NSW for regulating, warning, informing and guiding road users. It specifies the sign classification, numbering, shape and colour of each sign. Detailed design plans are also included for most signs. Some signs such as the G Series do not provide detailed designs as they are site specific. Refer to Australian Standard 1743, 1744 and 1742.2, and 1742.15 for further information.
AustralianroadsignsPDF
Mark construction, maintenance, and other work zones with these MUTCD compliant orange reflective diamond signs from Transportation Supply. Reach out to us by phone if you have any questions or would like an accurate shipping estimate.
RoadsignsAustralia meanings
We recommend Non Reflective Vinyl over Mesh as it's a better material that will last longer, and it's easier to print on so we can get it out the door to you faster. For night time use Standard Reflective is a must.
Road work ahead signs are available in several sizes and materials along with velcro overlays and flag mounts. Bright orange with bold black text, this standard road work signs alert drivers of construction ahead. Simply select quantity plus optional equipment. Lead time is 5 business days to ship out on average.
Road work ahead signs warn drivers so they can adjust their speed, stay alert, and be prepared to take necessary precautions. This is because construction projects can create uneven road surfaces, detours, and blocked lanes, which can cause traffic congestion and delays.
Transport for NSW recognise and celebrate the diversity of Aboriginal peoples and their ongoing cultures and care of Country. We pay respect to traditional custodians and Elders past and present.