Edmond is mistaken. Our Office has determined that the value of a task order may include the value of options, including an option to extend services under FAR clause 52.217-8, when the value of the option (if exercised) is evident from the face of the solicitation. Serco Inc., B-406061, B-406061.2, Feb. 1, 2012, 2012 CPD ¶ 61 at 6-7. While the TOPR here required contractors to submit prices for the base period and option periods 1-4, it did not require submission of prices that would be used if the Army exercised its option to extend services under FAR clause 52.217-8, nor did it provide any formula for calculating these prices.[2] In this regard, Edmond’s reliance on the TOPR’s statement that “the total evaluated price for orders would include all priced line items for the base year and all option periods” is misplaced, since the option-to-extend period here is not to be priced in proposals nor included in the evaluation of proposals.

20241014 — 107 likes, 4 comments - maspajarrr October 14, 2024 : "Cleaning the Nikon HP Finder✨".

DOCUMENT FOR PUBLIC RELEASE The decision issued on the date below was subject to a GAO Protective Order. This redacted version has been approved for public release.

Ring LightSale

201633 — shutter open -0.0625 shutter close 0.0625. Total shutter = 0.0625+0.0625 = 0.125. Shutter angle = 360*0.125 = 45. shutter open -0.125 shutter ...

Ring LightProfessional

202422 — Any lens with a focal length of between 8mm and 24mm is usually described as an ultra-wide. You'll be taking in a huge angle of view of what's ...

Ring Lightdesk

Edmond Scientific Company (Edmond), of Chantilly, Virginia protests the decision by the Department of the Army, Medical Research Acquisition Activity, not to set aside for small businesses a task order proposal request (TOPR) No. TOPR 14MC22318, issued under a multiple-award, indefinite-delivery/indefinite-quantity (ID/IQ) contract for a variety of business-process and other support services. The protester argues that the Army's decision not to reserve this task order for small business participation lacked a reasonable basis, was an abuse of discretion, and violated Federal Acquisition Regulation (FAR) 19.502-2(b), the so-called "Rule of Two."

At issue here is whether the value of the task order will be above or below the $10 million threshold for our jurisdiction. The TOPR, as amended, provides for evaluation of price and non-price factors, and states that the evaluated total price of a proposal will be “the total of all the priced line items for the base year and all options.” Agency Report (AR), Tab 14, TOPR amend. 3, at 21, 22. The independent government estimate (IGE), which the Army calculated by including estimates for the base year, three one-year options, and one ten-day transition option, values the order at approximately $[deleted] million. AR, Tab 3, IGE, at 3.

The ShiftCam Snaplight is a pocket sized ring light that goes everywhere you do to brighten your content with hands-free LED lighting. This adjustable selfie light enhances photos and videos with perfect illumination from four brightness settings, and its built in rechargeable battery lasts for up to two hours.

GAO lacks jurisdiction to hear protest of task order solicitation where independent government estimate of task order’s value, exclusive of the value of option to extend services, is below $10 million and solicitation does not provide for evaluation of option to extend services.

We approximate your location from your internet IP address by matching it to a geographic region or from the location entered during your previous visit to Apple.

Top 4 Anti-reflective Coatings Countdown · Crizal Sapphire HR · Crizal Prevencia · Crizal Sunshield · Crizal Rock. Learn More About Crizal. Top 4 Antireflective ...

[3] The protester also asserts that it expects its price will exceed the $10 million threshold and that this fact should be considered in addition to the Army’s IGE. Comments at 7, 8. We note that the agency has suspended the TOPR pending our resolution of this pre-closing protest, and therefore, has not yet received proposals. AR, Tab 15, TOPR amend. 4. Accordingly, we cannot rely on the value of submitted proposals to determine the value of the task order. See ICI Servs., Inc., B-409231.2, Apr. 23, 2014, 2014 CPD ¶ 132 at 3 n.3 (considering value of offerors’ submitted proposals for purposes of determining GAO jurisdiction).

Edmond argues that the IGE does not accurately represent the value of the order, because the TOPR also included FAR clause 52.217-8, which reserves for the government a six-month option to extend services. Comments at 8. In this regard, the protester relies on the statement in the TOPR that the total evaluated price would include “all option periods,” and maintains that “all option periods” must include the option to extend. Comments at 9; AR, Tab 14, TOPR amend. 3, at 21, 22. Edmond contends that including the value of the option to extend in the IGE--which in the protester’s view, should be valued at half the value of the third option year--would increase the task order’s value above the $10 million threshold. Comments at 9, 10.

Ring LightPortable

202288 — The clear aperture indicates the optical area meeting quality standards, with tolerances impacting performance and manufacturing complexity.

In sum, the protester has not shown the agency’s IGE to be inconsistent with the terms of the TOPR or an inaccurate measure of the total value of the task order. Since that value is below $10 million, our Office does not have jurisdiction to consider the protest.[3]

May 10, 2019 — You need to remove shims. Look at what the lens does when you focus closer, it becomes longer. Thus the optical elements are further away from ...

[1] The facts alleged and arguments raised by this protest are virtually identical to those denied by our Office in Edmond Scientific Co., B-410179, B-410179.2, Nov. 12, 2014, 2014 CPD ¶ 336.

Ring Lightwith Stand

Ron R. Hutchinson, Esq., Doyle & Bachman LLP, for the protester. Scott N. Flesch, Esq., Frank A. March, Esq., Department of the Army, for the agency. Lois Hanshaw, Esq., and Christina Sklarew, Esq., Office of the General Counsel, GAO, participated in the preparation of the decision.

Note: Products sold through this website that do not bear the Apple brand name are serviced and supported exclusively by their manufacturers in accordance with terms and conditions packaged with the products. Apple’s Limited Warranty does not apply to products that are not Apple branded, even if packaged or sold with Apple products. Please contact the manufacturer directly for technical support and customer service.

[2] The facts here are distinguishable from our decision in Serco Inc., supra, where the solicitation expressly provided for the evaluation of the value of the option to extend services. See also Major Contracting Servs., Inc., B-401472, Sept. 14, 2009, 2009 CPD ¶ 170 at 4 (where option to extend is not evaluated as part of the initial competition, contract extension is effectively a new procurement); Id. at 6 (rejecting argument that evaluating base year and option year prices is equivalent to evaluating price for option to extend).

Edmond Scientific Company (Edmond), of Chantilly, Virginia protests the decision by the Department of the Army, Medical Research Acquisition Activity, not to set aside for small businesses a task order proposal request (TOPR) No. TOPR 14MC22318, issued under a multiple-award, indefinite-delivery/indefinite-quantity (ID/IQ) contract for a variety of business-process and other support services. The protester argues that the Army’s decision not to reserve this task order for small business participation lacked a reasonable basis, was an abuse of discretion, and violated Federal Acquisition Regulation (FAR) § 19.502-2(b), the so-called “Rule of Two.” [1]

Ring LightLaptop

Protests filed with our Office in connection with the issuance or proposed issuance of a task or delivery order under a multiple-award contract are not authorized except where the order is valued over $10 million, or where the protester can show that the order increases the scope, period, or maximum value of the contract under which the order is issued. 10 U.S.C. § 2304c(e) (2012); see e.g., e-Management Consultants, Inc.; Centech Group, Inc., B-400585.2, B-400585.3, Feb. 3, 2009, 2009 CPD ¶ 39 at 6.

SnapLight's magnetic mount attaches effortlessly to your MagSafe iPhone or case, and included in the box is a magnetic sticker for use with other devices including iPad and Macbook.

It features a flexible flippable hinge to keep you in the spotlight during live streams, vlogs, video calls, no matter the angle. Positioned at the center of the LED ring is a convenient mirror which allows for last minute touch-ups before you capture or go live, ensuring you always look your best.

I'm a graduated mechanical engineer with a passion for cars, and my goal is to help other people passionate about cars learn how they work.

... disegno 2D e progettazione 3D. Accedi a una suite completa di potenti strumenti di modellazione e modifica 3D. Crea solidi 3D predefiniti, come scatole ...

2024419 — The focal length is one of the main characteristics of a lens. It is defined in millimeters and represents very roughly the distance between the sensor of your ...

52 Mini Ring Lights, 8 Large Ring Lights, 4 EZ Mount Ring Lights, 11 Controllers, 0 Accessories, 0 IO Modules, 0 Polarizer/Diffuser Kits, 0 Bluetooth Modules, ...