The Light Dome III is the flagship softbox for Aputure’s Bowens Mount lights, featuring the same 3ft (90cm) circular shape with a brand new quick-folding, flat-pack design. Designed for film and video professionals, the Light Dome III produces large and stunningly soft light while saving valuable time on set and space in your kit with its new quicker setup and slim profile.

Technical evaluator: Evaluation can be based on Single/Multiple evaluator(s) or self, selection for Tender Committee (TC) option shall also be available

GeM has enhanced the Push button Procurement functionality enabled as per DoE OM number F.6/7/2022-PPD dated 11th January 2023. The new guidelines for PBP are as follow:

Dome LightCeiling

Kettler Zeb Closeout Aluminum Adjustable Outdoor Patio Dining Table ... Net Retailers, LLC. Copyright 2024. All rights reserved.

Comprehensive warranty shall include preventive maintenance including calibration as per technical/ service /operational manual of the manufacturer, service charges and spares,. During the warranty period commencing from date of the successful completion of warranty period, Service personnel    shall visit each consignee site as recommended in the manufacturer’s technical/ service /operational manual, at least once in six months. warranty shall not be including the consumables .Further there will be 98% uptime warranty during warranty period on 24 (hrs) X 7 (days) X 365 (days) basis, with penalty, to extend warranty period by double the downtime period.

Note: No EMD to be taken from exempt category of sellers even by way of specific clauses mentioned in ATC / STC by the Buyers. Such clauses which are against the GeM GTC, will be treated as null and void.

Create beautiful, round eyelights with the Light Dome III’s 32-sided circular design to breathe life into the eyes of any subject. As the most circular shape of any softbox on the market, you can create rounder reflections that mimic natural light sources like the sun.

OEM or reseller  shall always accord most favoured client status to the buyer/consignee and shall give the most competitive price for spares and consumables of its machines/equipments supplied

The Light Dome III is compatible with all Aputure Bowens Mount point-source lights, including the Light Storm (e.g. LS 1200d Pro) and Electro Storm series (e.g., Electro Storm CS15). It is also compatible with the amaran 150c & 300c due to their metal Bowens Mount.

Dome LightVray

GeM system maintenance activity is planned from 25/06/2022 9:00 PM until 26/06/2022 12:00 Noon. While we will work towards avoiding any outages, the system may be unstable intermittently. As a preventive measure, you are requested to either prepone or postpone Bid related activities such as Bid creation, Evaluation, Seek Clarification, Reply Representation and Negotiations etc, to other dates as per your convenience. Also, you may like to avoid keeping Bid end date and Bid Opening dates on or near these dates if feasible. Please note, during this period Buyers can access all previous and ongoing Bid/RA status and details from their panel.

Please select "Allowed Values" for different specifications for properly defining your product. You can select multiple values as "Allowed Values" against any parameter to allow more competition.

The Light Dome III provides all the tools you need to shoot confidently right out of the box. Switch between two densities of diffusion to craft your soft light, or create more contrast and depth in your images with the included 40º fabric light control grid. With all the tools packed into a carrying bag, the Light Dome III is a ready-to-go solution for fine tuning the perfect lighting.

For product orders where the consignee has made some rejections at the PRC or CRAC stage, the sellers would now have an option to issue a supplementary invoice against these rejected quantities. This option would be available to the seller before the delivery date of the order has passed.

MSE preference: If buyer has selected MSE preference in bid then buyer will get option to send price match request to MSE if Non MSE bidder is selected as L1 and MSE price quoted is within L1+X% (X as defined in bid) range. In case buyer has not opted for MSE preference then buyer needs to provide competent authority approval with detail of approving authority.

All the organisations making procurement through GeM are hereby requested to take note of the discussion paper drafted by CERT-In on "Cyber Security Controls Matrix for Procurement of Services and Solutions by Government Organisations ". which is enclosed as Annexure.

The sellers are registered on GeM based on self-declaration of valid Drug License, product certification, test reports etc. However, buyers mandatorily check and validate the details at their end for all applicable licenses and certifications e.g., validity and authenticity/genuineness of drug license, product certification, manufacturer certification/licenses, test reports etc.

SCHOTT Tubular Diffuser for Ring Lights is useful for viewing opaque samples under the microscope.

In case if the seller has submitted the proof of delivery before the order's delivery date has passed, their shipments would be eligible for auto PRC. This means that if the consignee does not generate the PRC within 4 days from the date of delivery as per the proof of delivery submitted by the seller, then the system would generate an auto PRC, marking all the shipped quantities as PRC accepted. At this point, the consignee would have 2 more days to make any modifications. In case, if still no action has been taken by the consignee within these 2 days, then this system generated auto PRC would be considered as the final PRC which could no longer be modified.

Apr 15, 2022 — This coffee bar is a first-of-its-kind concept in America by Intelligentsia, located perfectly in the gorgeous city of Pasadena.

Minimum floor price: A new feature has made live to solve the above problem, minimum floor price feature is available for buyers to define the minimum floor price below which no service provider would be able to quote in bid. This feature will help buyers to get reasonable price offers in bids. This feature is available for all PSUs/CPSEs/State Buyers and MoD.

L1 negotiation: Buyer now gets an option to negotiate with L1 discovered from the financial evaluation. In case service provider has uploaded the price breakup then service provider gets the option to upload revised price breakup after conducting their negotiations with the buyer.

With reference to the clause 4, Section xiii, Sub-section 'm' of GeM GTC, it is to bring to your kind attention that the following categories of Sellers are exempted from furnishing Bid Security:

The Light Dome III is designed to keep up with the fast-paced world of filmmaking and video professionals. Its new 16 heavy-duty steel rods are sturdier and more durable, and maintain their parabolic shape better than the Light Dome II.

In case of custom/BOQ bid, it is recommended to take Notarized Undertaking from private drug manufacturers for necessary compliances. (attached format of "Notarized Undertaking")

It may also be noted that the adoption of cyber security controls by procuring entities in the procurement process may be kept voluntary (as best practises). However, after a year, based on the outcomes, learning control may be mandated as a part of all ICT-related procurement by government entities.

Training for registration and bidding for buyers and sellers - GeM offers self-help trainings for buyers and sellers to register and procure services from the GeM portal without any external help. The link to access these training programs is https://gem.gov.in/training/training_module.

Input Tax Credit - Input Tax Credit and Reverse Charge Mechanism feature in BID has been implemented. Input Tax Credit is required by Buyers who are eligible for Input Tax Credit on GST and GST cess (wherever applicable) in their purchase. Since they get credit of GST therefore, they require financial evaluation of BID considering input tax credit (ITC) so that L1 evaluation is on Net landed Cost to the Buyer. There are three types of sellers in this case. One is regular GST registered seller, unregistered seller and seller registered under composition scheme. This functionality is for all goods and services except services on commission base.

Creation of secondary user under different primary user with same mail id: The secondary user registration using an existing email address should be allowed for all the roles - Buyer, Consignee and PAO/DDO.

Simplify your toolkit with just one softbox for all your Bowens lights so you can work smarter, not harder. Like other Aputure softboxes, the Light Dome III features the universal Bowens Mount and is the perfect pairing for an array of point-source fixtures, ranging from the Aputure Light Storm series to the amaran 150c and amaran 300c.

Vaccines and Generic Drugs/Medicine categories - Categories of Vaccines required under the Universal Immunization Program (UIP) of MoHFW have been made live in consultation with them. The categories of TB medicines required under National TB program of MoHFW and other generic drugs/medicines have been made live.

Provision to upload additional SLA and SOW and ATC - Buyer has provision to write or upload document files for all of above features which will further become part of bid document and contract document and service provider has to abide by that. The terms and condition, scope of work or SLA mentioned by buyer will supersede by default conditions mentioned in SLA of the service.

All Golden parameters of the category and only those non-Golden parameters which Buyer has selected while creating bid (with values as selected by the Buyer or better than that), will now form part of the overall item specifications in Bid and will be published in the Bid document. Please note that the Non-Golden Parameters which are not specifically selected by the Buyer will now be discarded from bid and will not be published in bid and Sellers can offer a product with any of the allowed values for such non-golden parameters. If buyer want to make any non-golden parameter a part of bid, he must select that parameter and select its allowed values while creating bid, else GeM system would presume that buyer has no specific choice for that parameter and will accept any value for that parameter. No bid can then be rejected for such non selected parameter.

As per the OM issued by the Department of Expenditure, Ministry of Finance (No.F.6/18/2019.PPD), the following provisions have been enabled on GeM -

It may be noted that procuring entities may select and include appropriate and applicable controls from the control matrix indicated in the discussion paper as a part of their procurement of ICT services and solutions. Procuring entities may also consider adding additional specific controls as per their risk profile and scope of services.

We create high-quality audio plugins for musicians and audio engineers. FREE Full-feature 14-day Trial.

DomeLights in car

Re-blocking of funds - Buyers will now be able to block funds which they had not done at the time of order placement due to reasons like change of financial years etc.

"Buyer Selected Non-Golden Parameters are now mandatory Bid requirement” - Buyers can now choose both Golden and Non-Golden Parameters for defining the Bid Requirements. This will enable Buyers to impose a non-golden parameter as a mandatory specification for their Bids.

Escalation of Tickets – Please raise a ticket while flagging any issue to GeM, it helps better tracking, monitoring, and faster resolution. Further it helps in escalating it to higher level if issue is not resolved within defined timeline. Now tickets can be escalated https://gem.gov.in/gemtickets/create to higher level.

Bunching of predefined categories has been enabled now for bidding. Buyer can create bunch bid of items from same category. Buyer can also create bunch bid of items from different categories if such categories are enabled for bunching by GeM. If the item categories that you are trying to bunch are not enabled to be bunched together and you feel that these are items are having same Supplier / OEM base and are required to be bought together and bunching will not lead to restriction in competition, then you may please send an email request to GeM at request-bunch@gem.gov.in for enabling bunching of such categories. Please mention exact name of GeM categories that you are requesting for enabling bunching. Your request would be examined by GeM team and if it is found that such bunching would not lead to restrictive bidding, GeM would enable bunching of those categories. This is a one time exercise and once enabled, all buyers can bunch those categories in all their future bids. Custom and BoQ items are by default enabled to be bunched with other regular categories.

The 66088-LED is a high intensity visible light source. Its 15 W white light LED allows it to emit exclusively visible light, omitting ultraviolet and ...

GeM is in process to phase out the use of OTP based on authentication process at various stages of procurement like bid floating, bid submissions, invoicing, CRAC generation, Bill process, payment etc. For seamless and hassle-free transition it is advised to get yourself registered for esign or DSC based authentication services and complete all associated formalities. The exact date of disablement of the OTP based authentication will be communicated in near future.

Dome lightfixture cover

Invoice rejection by consignee - Once the invoice raised by service provider, consignee now has the feature to reject the invoice against some rejection reasons which will be visible to service provider. Based on the comments, service provider will be able to update the invoice and then submit again.

It is also to be noted that the values of the reference product are no longer part of the bid and only allowed values will be part of bid. For Golden parameters, by default GeM would incorporate all values that are better than the reference product's values in the bid. Buyer can select and allow any more values that he feels appropriate so that the bid is as generic as possible to attract maximum competition. Similarly for Buyer chosen non-golden parameters also, reference product's value and better values would be allowed by default and Buyer can add more values of his choice.

Dome lighttruck

Some cases have been reported where bidders have claimed non receipt of prior intimation of RA start. In order to ensure that no prospective eligible bidder is left out due to non intimation on time, it has been decide that RA will henceforth start 24 hours after the buyer proceeds for the RA creation and initiated RA. RA Start date and End Date will be notified to both buyer and sellers.

All Provisions of Drugs and Cosmetics Act, 1940 and Rules made there under as amended till date will always be applicable. This will include all notifications issued by Central Drugs Standard Control Organisation (CDSCO), Ministry of Health & Family Welfare (MoHFW) and Department of Pharmaceuticals (DOP), Ministry of Chemicals & Fertilizers from time to time in this regard.

Custom filter for buyer - GeM has introduced feature to choose “Others” option from the list of values of technical parameters in case desired parameter is not available. Buyer has to select “Intent of Buying” as “Bid” to enter the Customized Requirement.

Combining high performance, low maintenance and easy installation, the Caretaker™ LED luminaire is a simple, economical answer for dusk-to-dawn lighting needs.

Dome LightLED

Please find enclosed OM dated 28.04.2023 on revised format for Registration of bidders from countries sharing land border with India under Rule 144 (xi) for your kind information and necessary action.

Whether working on commercials, corporate videos, portraiture, or indie to high-end film productions, the Light Dome III’s new quick-folding design helps film and video professionals move through fast-paced productions, where every second counts. And as a complete ready-to-go solution, it is designed to improve your workflow, so you can achieve more with less.

GeM has launched the Push button procurement functionality on experimental basis enabling buyer to buy upto 5 lakhs simplifying the procurement process and require minimal intervention from buyer. This is system driven procurement enabled for the limited 50 categories . This has been enabled vide DoE OM number F.6/7/2022-PPD dated 11th January 2023. The buyer may refer the push button procurement manual for further details. The details of categories enabled for PBP is available here. The key guidelines for PBP are as follow

Bids are currently being evaluated on GeM based on the price quoted by the bidder at the time of bid participation. However, there are some use cases when the buyer publishes a bid and expects certain technical and commercial parameters to be used to evaluate the price, resulting in the evaluated price being different from the bidder's offered price.

Price breakup - GeM has introduced the functionality where Buyer can request for Price Breakup, Format to be uploaded by buyer for the breakup of components on cost/price offered by Service Provider in the Bid. Format uploaded by buyer may be used by service provider as reference for providing financial breakup. L1 will be evaluated by system basis on lowest price offered. GeM restricts this document to be available only during financial evaluation step, buyer will be able to open this document after financial will be open.

Dome lightplane

Bella Baby Happy Diaper are featured with cutting edge diaper rash free system a complex of unique features that keep the baby's skin healthy.

Yes, the Light Dome III comes with a flat and compact carrying bag that hold the softbox and its components, offering more space efficiency compared to the cylindrical carrying cases included with most circular quick-setup softboxes.

Please note that insecure products, solutions, and services lead to exposure to threats and cyber security breaches which affects procuring entities. Assuring cyber security as a feature of products and services require ensuring cyber security compliances as a part of procurement This will also help in building a cyber-security culture. Building awareness in government agencies to adopt cyber security controls as part of the procurement of ICT products and services, as well as engaging industry to put cyber security control requirements into practise, is crucial for meeting the objective of ensuring cyber security.

Single packet bid has been enabled on GeM and buyers can procure using it. In single packet bidding both technical and financial offerings are being opened simultaneously and buyers evaluate both financial and technical offers simultaneously and publish the evaluation results. Please refer to the user manual for details.

Online invoicing for services - In order to introduce end to end procurement on GeM Invoicing has been made live on GeM for service providers and buyers to streamline the complete process.

GeM system maintenance activity is planned from 17/06/2023 9:00 PM until 18/06/2023 02:00 PM. While we will work towards avoiding any outages, the system may be unstable intermittently. As a preventive measure, you are requested to either prepone or postpone Bid related activities such as Bid creation, Evaluation, Seek Clarification, Reply Representation and Negotiations etc, to other dates as per your convenience. Also, you may like to avoid keeping Bid end date and Bid Opening dates on or near these dates if feasible.

In case if the seller has submitted the proof of delivery before the order's delivery date has passed and the final PRC is also completed (through the system or by the consignee), then their shipments would be eligible for auto CRAC. This means that if the consignee has not generated the CRAC within 10 days from the date of delivery as per the proof of delivery submitted by the seller, then the system would generate an auto CRAC, marking all the PRC quantities as CRAC accepted. At this point, the consignee would have 3 more days to make any modifications. In case, if still no action has been taken by the consignee within these 3 days, then this system generated auto CRAC would be considered as the final CRAC which could no longer be modified.

Bunching of the items has been disabled for Direct Purchase and L1 purchase. For ordering multiple items put the items in separate carts and proceed to checkout in each cart.

The service category “Healthcare Human Resource Outsourcing Service” has been merged with the other existing manpower outsourcing services which are Manpower Outsourcing Services - Minimum Wage and Manpower Outsourcing Services - Fixed Remuneration . Hence, it has been disabled from the market for all new bids. Buyers can hire the healthcare resources from these 2 manpower outsourcing service categories. There will be no impact on already published bids.

GeM is in a process of development of functionality to deal the statutory variations of contract like GST, VAT etc online. In meantime till such functionality is deployed buyers and sellers are advised to deal variation of taxes OFFLINE at their end with due verification and scrutiny as per enforced tax rates, contract clause and applicable guidelines of organization.

20181030 — What is diffusion? It's the action of spreading light from a light source evenly so as to reduce glare and harsh shadows. But first, we need ...

Urban FLE51 – LED Poletop Luminaire ... The Urban LED poletop luminaire from Vision Lighting provides mounting versatility enabling it to suit a wide variety of ...

Dome lightmeaning

Make more room for lights with the Light Dome III’s flat-pack design. Unlike traditional quick softboxes that maintain their cylindrical shape when packed, the Light Dome III’s quick-setup speed ring folds into a slim, flat profile. This portable and travel-ready softbox requires less setup time, and allows you to free up more space for other filmmaking tools when transporting equipment.

The functionality for the collection of interest amount on the delayed payments as per DoE OM No.F.6/18/2019-PPD dated 3rd July 2020 is being made live from 01st August 2022, which would be applicable on all CRAC issued/generated on or after 01st August 2022. If the payment is delayed beyond prescribed timelines, the buyer will be liable to deposit interest as per DoE OM. Interests due showing in the Buyer dashboards for older contracts are being reset to zero and all future interests would have to be paid using online functionality deployed on the GeM using the SBI payment gateway.

It is noted that many times due to lack of awareness various clauses, provisions, and guidelines regarding cyber security requirements mandated by MeitY are not being incorporated while making procurements by buyer organisations. In order to give inputs to the procuring authorities regarding these aspects, Indian Computer Emergency Response Team (CERT-In) drafted a discussion paper regarding cyber security control matrix for the procurement of services and solutions by government organisations. The control matrix includes governance and policy, confidentiality, availability, regulatory complexity, audits and situational awareness, data security, application security, and network security. Discussion paper indicates the specification and requirements of different controls as well as indicative methods for verification for each control matrix. A copy of the discussion paper is enclosed herewith.

Custom bid and BOQ Bid- GeM strongly recommend use of category based bids - Use of Custom Bid / BoQ bid is not allowed for items for which regular category is available on GeM. Buyer can use the features of Additional parameters also to suit its requirement. Any bid created under Custom / BoQ category shall be cancelled by GeM without any notice, if it is found that regular category is available on GeM for similar items.

Sellers would now need to mandatorily comply with complete Bid specifications to proceed with Bid participation. Since bidders will now be pre-filtered and allowed to offer only those products which are matching with allowed values of Golden as well as non-Golden parameters (Buyer selected), there would now be no need for Buyer's to check or reject any bid on the ground of specification mis-match as far as GeM catalogues are concerned.

With reference to the OM No.F.6/1/2023-PPD dated 06.01.2023, from Dept. of Expenditure, the minimum service charges for the commission based Manpower Outsourcing services has been revised to 3.85%. Procuring entities can also fix the service charges above 3.85% with proper justification on file, wherever required. However, such service charges should not exceed 7% in any case. It is also recommended to use the Least Cost Selection (LCS) especially in High Value Bids, the template for which can be assessed on this link.

Bid opening from 3 days instead of 10 days only for central Gov & Central CPSE buyers and not applicable on BOQ and custom bids.

With the all-new quick-folding design, building the Light Dome III is now faster than ever, saving you valuable time on set. Being among the fastest circular softboxes to set up and break down on the market, the Light Dome III can snap into its full parabolic shape in seconds, allowing you to start shooting sooner.

Unlimited RA Auto Extensions - Now there is NO limit on number auto-extensions allowed in reverse auctions, GeM recommends use of unlimited auto extension for best price discovery.

To capture detailed technical and commercial parameters, GeM has added another feature whereby a buyer can declare the Technical and Commercial Loading Criteria for Bid Evaluation during Bid Creation itself, which will be printed for the bidders' reference in the Bid document.

The system would not allow the seller to generate an invoice, if the delivery period of an order has passed. The sellers must also submit the proof of their delivery to the consignee's location before the delivery date of the orders has passed, for their shipments to be eligible for Auto PRC and Auto CRAC

DPIIT has issued OM P-45014/33/2021-BE-II (E-64737) dated December 20th, 2022 related to common examples of "Restrictive and discriminatory conditions against the local suppliers" and "Other conditions which make the bid non­ compliant to PPP-Mll Order''. Buyers are advised to comply with the same and ensure that their tenders are compliant with PPP-MII Order and don't include restrictive and discriminatory conditions against the local suppliers.

Buyers are advised to comply the latest OM No.F.7/10/2021-PPD (1) dated 23.02.2023 issued by DoE for the restrictions under Rule 144(xi) of the General Financial Rules (GFRs), 2017 while procuring on GeM.

Please refer push button procurement Manual for detailed guidelines. The details of Categories enabled for PBP are available here.

Forward Auction is a new feature addition into GeM platform enabling integrated B2B (Business to Business) and B2C (Business to Customer) auction featuring pan India auctioneers and bidders. As a GeM registered buyer, user can create “Auction” to sell off goods/materials/immovable assets within GeM portal using Forward Auction application and can reach out pan India bidders at a larger scale. To know more, click here

If you're just starting out and are looking for a controller with an easy-to-use interface, take a look at the American DJ RGB 3C DMX LED Lighting ...

Only manufacturers for particular drugs/medicine may be eligible to participate in the bid or quote for the drugs/medicine.

The selection of the Techno Commercial for Bid Evaluation will be optional for the buyer and the same can be saved as "No," if buyer doesn’t wish to go with the same.

The Light Dome III includes two choices of front diffusion (1 and 2-stop diffusion cloths) as well as a 40º fabric light control grid for enhancing contrasting and limiting spill light.

The option of acceptance/ rejection of Direct Purchase/ L1 orders will be discontinued on GeM from 29th July 22 onwards. All the orders placed on GeM shall be auto accepted unless the buyer is red flagged or the order is for a freight intensive item. Only in these cases, the sellers will get an option to Accept/ Reject the order. Even in these cases, the order shall be auto accepted in 5 days if no action is taken by the seller.