Reusable Ear Plugs, EP03 - Karam Online! - reusable ear protection
Roadsigns
Overall width of a vehicle means a dimension which is measured according to ISO standard 612-1978, term No. 6.2. In the case of vehicles of category other than M1, in addition to the provisions of that standard, when measuring the vehicle width the following devices shall not be taken into account:
Definition ofcrestin Science
Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;
Demarcation Point means the point where Qwest owned or controlled facilities cease, and CLEC, End User Customer, premises owner or landlord ownership or control of facilities begin. "Designed, Verified and Assigned Date" or "DVA" means the date on which implementation groups are to report that all documents and materials have been received and are complete.
Integrated pest management means careful consideration of all available plant protection methods and subsequent integration of appropriate measures that discourage the development of populations of harmful organisms and keep the use of plant protection products and other forms of intervention to levels that are economically and ecologically justified and reduce or minimise risks to human health and the environment. ‘Integrated pest management’ emphasises the growth of a healthy crop with the least possible disruption to agro-ecosystems and encourages natural pest control mechanisms;
What is acrestof a wave
Tier 2 Wire Centers means those CenturyLink Wire Centers that are not Tier 1 Wire Centers, but contain at least three (3) Fiber-based Collocators, at least twenty-four thousand (24,000) Business Lines, or both. Once a Wire Center is determined to be a Tier 2 Wire Center, that Wire Center is not subject to later reclassification as a Tier 3 Wire Center.
Heat input means the product (expressed in mmBtu/time) of the gross calorific value of the fuel (expressed in Btu/lb) and the fuel feed rate into the combustion device (expressed in mass of fuel/time) and does not include the heat derived from preheated combustion air, recirculated flue gases, or ex- haust from other sources.
Surplus Interconnection Request means a request submitted by a Surplus Interconnection Customer, pursuant to Tariff, Attachment RR, to utilize Surplus Interconnection Service within the Transmission System in the PJM Region. A Surplus Interconnection Request is not a New Service Request.
Dip signmeaning
Reference Interconnection Offer or “RIO” means a document published by a service provider specifying terms and conditions on which the other service provider may seek interconnection with such service provider;
Public School Student Accessing Courses at a Distance means a student who is scheduled for a full course load through the District and attends all classes virtually.
Crestof a hillmeaning
Cogeneration unit means a unit that has equipment used to produce electric energy and forms of useful thermal energy (such as heat or steam) for industrial, commercial, heating or cooling purposes, through the sequential use of energy.
Table 7 - Minimum Freeboard and Crest Width Requirement Design Flood Discharge Q (m2/s) Design Flood Discharge Q (m2/s) Source: Technical Standards & Guidelines for Flood control and Sabo Work, JICA-DPWH, 2010 For the backwater effect in a tributary, the height of the dike in the transition stretch should not be lower than that of the main river or even higher at the confluence in order to prevent inundation in the subject areas.
Fat wood means pieces of wood kindling with high naturally-occurring levels of sap or resin which enhance ignition of the kindling. “Fat wood” does not include any kindling with substances added to enhance flammability, such as wax-covered or wax-impregnated wood-based products.
Interconnection Request means a Generation Interconnection Request, a Transmission Interconnection Request and/or an IDR Transfer Agreement.
Tier 1 Wire Centers means those CenturyLink Wire Centers that contain at least four (4) Fiber- based Collocators, at least thirty-eight thousand (38,000) Business Lines, or both. Tier 1 Wire Centers also are those CenturyLink tandem switching locations that have no line-side switching facilities, but nevertheless serve as a point of traffic aggregation accessible by CLEC. Once a Wire Center is determined to be a Tier 1 Wire Center, that Wire Center is not subject to later reclassification as a Tier 2 or Tier 3 Wire Center.
Primary highway means any highway, other than an inter- state highway, at any time officially designated as a part of the fed- eral−aid primary system by the department and approved by the appropriate authority of the federal government.
Participating Home Infusion Therapy Provider means a Home Infusion Therapy Provider who has a written agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan to provide services to you at the time services are rendered.
Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.
Crest roadsign
Grenfell Tower support payment means a payment made to a person because that person was affected by the fire on 14th June 2017 at Grenfell Tower, or a payment to the personal representative of such a person—
Crestsign
Surplus Interconnection Service means any unneeded portion of Interconnection Service established in an Interconnection Service Agreement, such that if Surplus Interconnection Service is utilized, the total amount of Interconnection Service at the Point of Interconnection would remain the same.
Roadcrown
S.S. and Shukla, M.K. (1971), "Characteristics of Flow over Weirs of Finite Crest Width", Journal of Hydraulic Division ASCE, Vol.97, No.11, PP.1807-1816.
The universal biosafety sign shall be posted on each closed system and primary containment equipment when used to contain viable organisms containing recombinant or synthetic nucleic acid molecules, bloodborne pathogens, human derived materials and other potentially infectious materials.
See Environmental Parties Br. Ex., BP-24-R-ID-01, at 7–8; Tribal Parties Br. Ex., BP-24-R-YN-01, at 19; see also Environmental Parties Br., BP-24-B-ID-01, at 10 n.
EHS will maintain a supply of the required biohazard labels and signs, which will be available upon request for campus facilities at the EHS Safety Portal (Lab Label and Lab Door Sign requests).
In 1975, a previous blanket was installed at the downstream toe after significant seepage was noted in the area.The basic dam dimensions are total Top or Crest length, concrete and earth of 1,550 feet, Maximum Height or elevation above streambed (922 feet NGVD) 52 feet, Crest Width 25 feet, and Maximum Width at toe of Slope 510 feet.
Integrated Services Digital Network (ISDN means a switched network service that provides end-to-end digital connectivity for the simultaneous transmission of voice and data. Basic Rate Interface-ISDN (BRI-ISDN) provides for a digital transmission of two (2) 64 Kbps bearer channels and one (1) 16 Kbps data channel (2B+D).
For river improvement works, the freeboard stipulated in the Japanese and Philippine National standards as shown in Table 4.8.5 is adopted.Table 4.8.5 Crest Width Design Flood Discharge (m3/s)Source: DPWH Standard Guideline 2015, Manual for Government Ordinance for Structural Standard for River Administration Facilities 4) Slope The slope of the lakeshore dike is the same as that of the Laguna de Bay lakeshore dike installed in the "Metro Manila Flood Control Project - West of Mangahan Floodway".
Project Management Unit and “PMU” each means the Recipient’s unit responsible for the implementation of its Respective Part of the Project referred to in Section I.A.2 of Schedule 2 to this Agreement.